100 Bishopsgate

London  |  United Kingdom

Date: 2017
Location: London, UK
Sector: Office development

A major new office development in the heart of the City of London consisting of 44 storeys.

This project was very challenging from an expansion perspective due to the height of building & the forces/weight of pipework involved.EP&S worked with the contractor to provide a full expansion design proposal.

Metal Expansion Joints, Anchors, Guides, Flexible Hoses & Flexible Couplings were supplied by EP&S for the LTHW, HWS, Chilled Water & Condenser Water systems.

As part of the installation package EP&S Ltd were also commissioned to supply bespoke heavy-duty anchor frames required on the main Chilled Water Risers within the building.