Warning: include(rss.php): failed to open stream: No such file or directory in /var/sites/e/epands.com/public_html/index.php on line 8

Warning: include(rss.php): failed to open stream: No such file or directory in /var/sites/e/epands.com/public_html/index.php on line 8

Warning: include(): Failed opening 'rss.php' for inclusion (include_path='.:/usr/local/php-7.3.3-flock/lib/php') in /var/sites/e/epands.com/public_html/index.php on line 8
Case Study – Great Western Academy | EPandS Website

Great Western Academy

Swindon  |  United Kingdom

Date: 1st January 2019
Location: Swindon, UK
Sector: Educational & Institutional

This brand-new academy school for the borough of Swindon provided unique challenges for EP&S.

In this brand-new building, all pipework installed was plastic and on show in open ceilings. It was imperative that EP&S provided a robust solution that would both work with the plastic pipework, while fitting in with the visual aesthetic of the open ceiling design.

EP&S Ltd worked in conjunction with the main contractor & the mechanical sub-contractor to provide full expansion calculations & ensure that all expansion devices supplied functioned correctly within their designated installed positions.

Products Installed